HEAL DSpace

A fuzzy multicriteria evaluation system for the assessment of tunnels vis- à-vis surface roads: Theoretical aspects - Part I

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Panou, KD en
dc.contributor.author Sofianos, AI en
dc.date.accessioned 2014-03-01T01:17:21Z
dc.date.available 2014-03-01T01:17:21Z
dc.date.issued 2002 en
dc.identifier.issn 0886-7798 en
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/14476
dc.subject Cost-benefit analysis en
dc.subject Evaluation en
dc.subject Multicriteria analysis en
dc.subject Road tunnels en
dc.subject Tunneling en
dc.subject.classification Construction & Building Technology en
dc.subject.classification Engineering, Civil en
dc.subject.other Cost benefit analysis en
dc.subject.other Decision making en
dc.subject.other Fuzzy sets en
dc.subject.other Fuzzy multicriteria evaluation systems en
dc.subject.other Tunnels en
dc.subject.other assessment method en
dc.subject.other cost-benefit analysis en
dc.subject.other multicriteria analysis en
dc.subject.other road en
dc.subject.other tunnel en
dc.subject.other tunnel design en
dc.title A fuzzy multicriteria evaluation system for the assessment of tunnels vis- à-vis surface roads: Theoretical aspects - Part I en
heal.type journalArticle en
heal.identifier.primary 10.1016/S0886-7798(02)00006-8 en
heal.identifier.secondary http://dx.doi.org/10.1016/S0886-7798(02)00006-8 en
heal.language English en
heal.publicationDate 2002 en
heal.abstract In current practice, the most frequently used quantitative parameter for the selection between a road tunnel and a surface road, is the construction cost. Other parameters that could be of interest to a decision-maker are either absent or existing in a purely qualitative form that does not lend itself for comparisons between alternative solutions. For this reason, a tailor-made methodology was developed, aiming to facilitate the comparative assessment of road tunnels against surface roads on an overall basis. This methodology is based upon the principles of MultiCriteria (MCA) and Cost-Benefit Analysis (CBA), incorporating the full range of cost, technical, operational, environmental and spatial criteria required for the proper evaluation of the two alternatives. (C) 2002 Elsevier Science Ltd. All rights reserved. en
heal.publisher PERGAMON-ELSEVIER SCIENCE LTD en
heal.journalName Tunnelling and Underground Space Technology en
dc.identifier.doi 10.1016/S0886-7798(02)00006-8 en
dc.identifier.isi ISI:000177537100012 en
dc.identifier.volume 17 en
dc.identifier.issue 2 en
dc.identifier.spage 195 en
dc.identifier.epage 207 en


Αρχεία σε αυτό το τεκμήριο

Αρχεία Μέγεθος Μορφότυπο Προβολή

Δεν υπάρχουν αρχεία που σχετίζονται με αυτό το τεκμήριο.

Αυτό το τεκμήριο εμφανίζεται στην ακόλουθη συλλογή(ές)

Εμφάνιση απλής εγγραφής