HEAL DSpace

Gas turbine test parameters corrections including operation with water injection

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Mathioudakis, K en
dc.date.accessioned 2014-03-01T01:20:33Z
dc.date.available 2014-03-01T01:20:33Z
dc.date.issued 2004 en
dc.identifier.issn 0742-4795 en
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/15956
dc.subject Gas Turbine en
dc.subject.classification Engineering, Mechanical en
dc.subject.other Efficiency en
dc.subject.other Error correction en
dc.subject.other Flow patterns en
dc.subject.other Performance en
dc.subject.other Power converters en
dc.subject.other Temperature en
dc.subject.other Test facilities en
dc.subject.other Water injection en
dc.subject.other Acceptance testing en
dc.subject.other Correction curve en
dc.subject.other Mass flow rate en
dc.subject.other Specific operating point en
dc.subject.other Test parameters correction en
dc.subject.other Gas turbines en
dc.subject.other gas turbine en
dc.subject.other testing method en
dc.subject.other water injection en
dc.title Gas turbine test parameters corrections including operation with water injection en
heal.type journalArticle en
heal.identifier.primary 10.1115/1.1691443 en
heal.identifier.secondary http://dx.doi.org/10.1115/1.1691443 en
heal.language English en
heal.publicationDate 2004 en
heal.abstract Methods for correcting data from gas turbine acceptance testing are discussed, focusing on matters which are not sufficiently covered by existing standards. First a brief outline is presented of the reasoning on which correction curves are based. Typical performance correction curves are shown together with the method of calculating mass flow rate and turbine inlet temperature from test data. A procedure for verifying guarantee data at a specific operating point is then given. Operation with water injection is then considered. Ways of correcting performance data are proposed, and the reasoning of following such a procedure is discussed. Corrections for water amount as well as power and efficiency are discussed. Data from actual gas turbine testing are used to demonstrate how the proposed procedure can be applied in actual cases of acceptance testing. en
heal.publisher ASME-AMER SOC MECHANICAL ENG en
heal.journalName Journal of Engineering for Gas Turbines and Power en
dc.identifier.doi 10.1115/1.1691443 en
dc.identifier.isi ISI:000222192700018 en
dc.identifier.volume 126 en
dc.identifier.issue 2 en
dc.identifier.spage 334 en
dc.identifier.epage 341 en


Αρχεία σε αυτό το τεκμήριο

Αρχεία Μέγεθος Μορφότυπο Προβολή

Δεν υπάρχουν αρχεία που σχετίζονται με αυτό το τεκμήριο.

Αυτό το τεκμήριο εμφανίζεται στην ακόλουθη συλλογή(ές)

Εμφάνιση απλής εγγραφής