Assessment of ground conditions with respect to mechanised tunnelling for the construction of the extension of the Athens Metro to the city of Piraeus

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Marinos, PG en
dc.contributor.author Novack, M en
dc.contributor.author Benissi, M en
dc.contributor.author Stoumpos, G en
dc.contributor.author Papouli, D en
dc.contributor.author Panteliadou, M en
dc.contributor.author Marinos, V en
dc.contributor.author Boronkay, K en
dc.contributor.author Korkaris, K en
dc.date.accessioned 2014-03-01T01:29:53Z
dc.date.available 2014-03-01T01:29:53Z
dc.date.issued 2009 en
dc.identifier.issn 1435-9529 en
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/19396
dc.subject Athens Metro en
dc.subject EPBM en
dc.subject Piraeus en
dc.subject Slurry TBM en
dc.subject TBM en
dc.subject.classification Engineering, Environmental en
dc.subject.classification Engineering, Geological en
dc.subject.classification Geosciences, Multidisciplinary en
dc.subject.other Boring machines (machine tools) en
dc.subject.other Earth boring machines en
dc.subject.other Excavation en
dc.subject.other Lithology en
dc.subject.other Tunneling (excavation) en
dc.subject.other Tunneling machines en
dc.subject.other Tunnels en
dc.subject.other Athens Metro en
dc.subject.other EPBM en
dc.subject.other Piraeus en
dc.subject.other Slurry TBM en
dc.subject.other TBM en
dc.subject.other Railroad tunnels en
dc.subject.other assessment method en
dc.subject.other ground conditions en
dc.subject.other railway construction en
dc.subject.other TBM en
dc.subject.other tunnel design en
dc.subject.other tunneling en
dc.subject.other underground construction en
dc.subject.other Athens [Attica] en
dc.subject.other Attica en
dc.subject.other Eurasia en
dc.subject.other Europe en
dc.subject.other Greece en
dc.subject.other Piraeus en
dc.subject.other Southern Europe en
dc.title Assessment of ground conditions with respect to mechanised tunnelling for the construction of the extension of the Athens Metro to the city of Piraeus en
heal.type journalArticle en
heal.identifier.primary 10.1007/s10064-008-0183-9 en
heal.identifier.secondary http://dx.doi.org/10.1007/s10064-008-0183-9 en
heal.language English en
heal.publicationDate 2009 en
heal.abstract This paper refers to the proposed western extension of the Athens Metro to Piraeus city. The railway consists of a 9.45 m diameter, 8.2 km long tunnel and seven stations. Tunnelling works are expected to be undertaken within a variety of lithological formations ranging from very strong alpine limestones to recent soft littoral deposits. The tunnel alignment was divided into 12 areas with respect to the geological and geotechnical conditions that may be encountered during construction. In many of these zones, the geotechnical conditions together with the presence of sensitive surface and/or subsurface structures led to the selection of a closed-face TBM (Earth Pressure Balance Machine or Slurry Tunnel Boring Machine) as the appropriate tunnelling technique. The Piraeus extension is a project where in places both types of commonly used closed-face tunnelling machines will encounter 'text book' application areas, but not always. The applicability of each type of TBM is discussed using the available data obtained from an extensive site investigation. © Springer-Verlag 2009. en
heal.publisher SPRINGER HEIDELBERG en
heal.journalName Bulletin of Engineering Geology and the Environment en
dc.identifier.doi 10.1007/s10064-008-0183-9 en
dc.identifier.isi ISI:000263059900002 en
dc.identifier.volume 68 en
dc.identifier.issue 1 en
dc.identifier.spage 17 en
dc.identifier.epage 26 en