dc.contributor.author |
Vosniakos, G |
en |
dc.contributor.author |
Davies, B |
en |
dc.date.accessioned |
2014-03-01T01:41:40Z |
|
dc.date.available |
2014-03-01T01:41:40Z |
|
dc.date.issued |
1993 |
en |
dc.identifier.uri |
https://dspace.lib.ntua.gr/xmlui/handle/123456789/23568 |
|
dc.subject |
Conflict Resolution |
en |
dc.subject |
Feature Extraction |
en |
dc.subject |
Knowledge Base |
en |
dc.subject |
Process Planning |
en |
dc.title |
Knowledge-based selection and sequencing of hole-making operations for prismatic parts |
en |
heal.type |
journalArticle |
en |
heal.identifier.primary |
10.1007/BF01756631 |
en |
heal.identifier.secondary |
http://dx.doi.org/10.1007/BF01756631 |
en |
heal.publicationDate |
1993 |
en |
heal.abstract |
This paper describes the rule structure used to select the appropriate sequence of operations to produce various types of holes in 2 1/2D prismatic components manufactured on machining centres. Operation selection is based on forward chained rules coded in Prolog. A different rule priority sequence is applicable depending on the rule fired last. This solves the conflict resolution problem and |
en |
heal.journalName |
International Journal of Advanced Manufacturing Technology |
en |
dc.identifier.doi |
10.1007/BF01756631 |
en |