New integrated system for production planning in open pit mines

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Michiotis, A en
dc.contributor.author Xerocostas, D en
dc.date.accessioned 2014-03-01T01:46:04Z
dc.date.available 2014-03-01T01:46:04Z
dc.date.issued 1997 en
dc.identifier.issn 14312719 en
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/24835
dc.relation.uri http://www.scopus.com/inward/record.url?eid=2-s2.0-0031221926&partnerID=40&md5=ddc55cf93f7c39e009e0cdca6f83e081 en
dc.subject.other Algorithms en
dc.subject.other Coal deposits en
dc.subject.other Heuristic methods en
dc.subject.other Lignite mines en
dc.subject.other Production control en
dc.subject.other Strategic planning en
dc.subject.other Extended horizontal stratification en
dc.subject.other Open pit mining en
dc.title New integrated system for production planning in open pit mines en
heal.type journalArticle en
heal.publicationDate 1997 en
heal.abstract One of the most important factors of mine operation scheduling is the production planning. The importance of production planning, on one hand, and the complications during its application phase, on the other, because of the nature and the number of factors that influence it, undoubtedly make the use of specific methods and tools necessary in order to find better and more flexible solutions to the problem. In this paper the problem of production planning in open-pit lignite mining is approached through a combination of heuristic algorithms. Specifically, our approach is based on the exploitation of a lignite deposit with an extended horizontal stratification and on the use of the `German equipment method'. A new integrated system has been developed resulting in the following: a) Programming the lignite/waste material to be extracted throughout the exploitation process. b) Estimating the progress of exploitation at any given time as well as the time required for the extraction of given quantities of lignite/waste. c) Indicating alternatives for the operation of the established main equipment in order to meet the demand for lignite. en
heal.publisher Trans Tech Publ, Clausthal-Zellerfeld, Germany en
heal.journalName Braunkohle/Surface Mining en
dc.identifier.volume 49 en
dc.identifier.issue 5 en
dc.identifier.spage 481 en
dc.identifier.epage 484 en


Αρχεία σε αυτό το τεκμήριο

Αρχεία Μέγεθος Μορφότυπο Προβολή

Δεν υπάρχουν αρχεία που σχετίζονται με αυτό το τεκμήριο.

Αυτό το τεκμήριο εμφανίζεται στην ακόλουθη συλλογή(ές)

Εμφάνιση απλής εγγραφής