HEAL DSpace

Road tunnel early cost estimates using multiple regression analysis

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Petroutsatou, C en
dc.contributor.author Lambropoulos, S en
dc.contributor.author Pantouvakis, J en
dc.date.accessioned 2014-03-01T01:55:12Z
dc.date.available 2014-03-01T01:55:12Z
dc.date.issued 2006 en
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/27648
dc.subject Construction Cost en
dc.subject Cost Estimation en
dc.subject Multiple Regression Analysis en
dc.subject Parametric Estimation en
dc.subject Statistical Techniques en
dc.subject Decision Maker en
dc.title Road tunnel early cost estimates using multiple regression analysis en
heal.type journalArticle en
heal.identifier.primary 10.1007/BF02941259 en
heal.identifier.secondary http://dx.doi.org/10.1007/BF02941259 en
heal.publicationDate 2006 en
heal.abstract Among construction projects, the risk in the production of road tunnels is particularly high due to the inherit uncertainties of the underground conditions. Equally, tunnel costs are considerably higher as compared to those of normal surface roads. As published literature on early cost estimating tools for road tunnels is scarce, projects sponsors, decision makers and engineers lack reliable tools, especially en
heal.journalName Operational Research en
dc.identifier.doi 10.1007/BF02941259 en


Αρχεία σε αυτό το τεκμήριο

Αρχεία Μέγεθος Μορφότυπο Προβολή

Δεν υπάρχουν αρχεία που σχετίζονται με αυτό το τεκμήριο.

Αυτό το τεκμήριο εμφανίζεται στην ακόλουθη συλλογή(ές)

Εμφάνιση απλής εγγραφής