HEAL DSpace

Modeling of combined cycle units in probabilistic production costing models

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Contaxi, E en
dc.contributor.author Papachristou, D en
dc.contributor.author Contaxis, G en
dc.date.accessioned 2014-03-01T02:42:17Z
dc.date.available 2014-03-01T02:42:17Z
dc.date.issued 2003 en
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/30917
dc.subject Combined cycle units en
dc.subject Probabilistic production model en
dc.subject Production costing model en
dc.subject.other Combined cycle units en
dc.subject.other Costing model en
dc.subject.other Economic operations en
dc.subject.other Forced outage rates en
dc.subject.other Multi-state reliability en
dc.subject.other Operating levels en
dc.subject.other Partial failure en
dc.subject.other Probabilistic production costing en
dc.subject.other Production models en
dc.subject.other Reliability model en
dc.subject.other Thermal units en
dc.subject.other Two-state en
dc.subject.other Steam generators en
dc.subject.other Gas turbines en
dc.title Modeling of combined cycle units in probabilistic production costing models en
heal.type conferenceItem en
heal.identifier.primary 10.1109/PTC.2003.1304380 en
heal.identifier.secondary http://dx.doi.org/10.1109/PTC.2003.1304380 en
heal.identifier.secondary 1304380 en
heal.publicationDate 2003 en
heal.abstract To simulate the economic operation of a Power System, production costing models utilize the multi-block representation of the conventional units. Each capacity block of a conventional thermal unit is described by a two-state reliability model. In this paper a reliability model for combined cycle units is proposed. With the model proposed a combined cycle unit consisting of N gas turbines and a steam generator can be represented by N blocks, each of which corresponds to the various operating levels of the unit. For each operating block a multi-state reliability model is proposed, in order to take into account the partial failures of the unit when required to operate at that level, taking into consideration the forced outage rates of the gas turbines and the forced outage rate of the steam generator. © 2003 IEEE. en
heal.journalName 2003 IEEE Bologna PowerTech - Conference Proceedings en
dc.identifier.doi 10.1109/PTC.2003.1304380 en
dc.identifier.volume 3 en
dc.identifier.spage 159 en
dc.identifier.epage 163 en


Αρχεία σε αυτό το τεκμήριο

Αρχεία Μέγεθος Μορφότυπο Προβολή

Δεν υπάρχουν αρχεία που σχετίζονται με αυτό το τεκμήριο.

Αυτό το τεκμήριο εμφανίζεται στην ακόλουθη συλλογή(ές)

Εμφάνιση απλής εγγραφής