dc.contributor.author |
Avramidou, RM |
en |
dc.contributor.author |
Anastasopoulos, K |
en |
dc.contributor.author |
Casas-Cubillos, J |
en |
dc.contributor.author |
Ciechanowski, M |
en |
dc.contributor.author |
Fampris, X |
en |
dc.contributor.author |
Gaj, WM |
en |
dc.contributor.author |
Fernandez-Penacoba, G |
en |
dc.contributor.author |
Fluder, C |
en |
dc.contributor.author |
Gomes, P |
en |
dc.contributor.author |
Gousiou, E |
en |
dc.contributor.author |
Jeanmonod, N |
en |
dc.contributor.author |
Karagiannis, F |
en |
dc.contributor.author |
Koumparos, A |
en |
dc.contributor.author |
Macuda, P |
en |
dc.contributor.author |
Patsouli, A |
en |
dc.contributor.author |
Suraci, A |
en |
dc.contributor.author |
Vauthier, N |
en |
dc.contributor.author |
Vottis, C |
en |
dc.date.accessioned |
2014-03-01T02:44:47Z |
|
dc.date.available |
2014-03-01T02:44:47Z |
|
dc.date.issued |
2007 |
en |
dc.identifier.issn |
10957863 |
en |
dc.identifier.uri |
https://dspace.lib.ntua.gr/xmlui/handle/123456789/31949 |
|
dc.subject |
Control System |
en |
dc.subject |
Large Hadron Collider |
en |
dc.subject |
Superfluid Helium |
en |
dc.subject.other |
Colliding beam accelerators |
en |
dc.subject.other |
Control systems |
en |
dc.subject.other |
Cryogenics |
en |
dc.subject.other |
Helium |
en |
dc.subject.other |
Inert gases |
en |
dc.subject.other |
Superfluid helium |
en |
dc.subject.other |
Cool downs |
en |
dc.subject.other |
Cryogenic instrumentations |
en |
dc.subject.other |
Helium temperatures |
en |
dc.subject.other |
Large hadron collider |
en |
dc.subject.other |
Medical imaging |
en |
dc.title |
LHC cryogenics hardware commissioning |
en |
heal.type |
conferenceItem |
en |
heal.identifier.primary |
10.1109/NSSMIC.2007.4437326 |
en |
heal.identifier.secondary |
http://dx.doi.org/10.1109/NSSMIC.2007.4437326 |
en |
heal.identifier.secondary |
4437326 |
en |
heal.publicationDate |
2007 |
en |
heal.abstract |
The installation of the Large Hadron Collider at CERN is being completed. The magnets are installed and the emphasis is now given to the commissioning, with the cool down of each of the 8 sectors to superfluid helium temperature in progress. This work describes the cryogenic instrumentation and control system and their commissioning. © 2007 IEEE. |
en |
heal.journalName |
IEEE Nuclear Science Symposium Conference Record |
en |
dc.identifier.doi |
10.1109/NSSMIC.2007.4437326 |
en |
dc.identifier.volume |
2 |
en |
dc.identifier.spage |
1691 |
en |
dc.identifier.epage |
1694 |
en |