HEAL DSpace

Long term European field tests for microgrids

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Buchholz, B en
dc.contributor.author Erge, T en
dc.contributor.author Hatziargyriou, N en
dc.date.accessioned 2014-03-01T02:44:49Z
dc.date.available 2014-03-01T02:44:49Z
dc.date.issued 2007 en
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/31955
dc.subject Energy management en
dc.subject Load management en
dc.subject Pilot installation en
dc.subject Power quality en
dc.subject.other Electric power system interconnection en
dc.subject.other Energy management en
dc.subject.other Installation en
dc.subject.other Power quality en
dc.subject.other Reliability analysis en
dc.subject.other Renewable energy resources en
dc.subject.other Energy supply en
dc.subject.other Load management en
dc.subject.other Pilot installation en
dc.subject.other Voltage distribution grids en
dc.subject.other Electric loads en
dc.title Long term European field tests for microgrids en
heal.type conferenceItem en
heal.identifier.primary 10.1109/PCCON.2007.373033 en
heal.identifier.secondary http://dx.doi.org/10.1109/PCCON.2007.373033 en
heal.identifier.secondary 4239223 en
heal.publicationDate 2007 en
heal.abstract Integrating a large number of renewable and distributed energy resources requires an active interaction between generators and loads. In the recent years, several pilot installations have been realized which demonstrate different concepts for energy management in low voltage distribution grids. This paper describes selected pilot installations, where long term field tests on microgrids have been performed in low voltage grid segments: - Kythnos island, Greece - ""Am Steinweg"" estate, Stutensee, Germany - Mannheim-Wallstadt, Germany Goals of these pilot installations are to validate three representative approaches for energy management: - Island with no connection to a feeder - Interconnected grid segment, centrally dispatched - Interconnected grid segment, focus on customer integration Long term tests focus on the reliable contribution of DER to energy supply. As a result, all concepts have proven reliable and suitable for further long term application. -The results will play a role in the development of grid connection requirements. © 2007 IEEE. en
heal.journalName Fourth Power Conversion Conference-NAGOYA, PCC-NAGOYA 2007 - Conference Proceedings en
dc.identifier.doi 10.1109/PCCON.2007.373033 en
dc.identifier.spage 643 en
dc.identifier.epage 645 en


Αρχεία σε αυτό το τεκμήριο

Αρχεία Μέγεθος Μορφότυπο Προβολή

Δεν υπάρχουν αρχεία που σχετίζονται με αυτό το τεκμήριο.

Αυτό το τεκμήριο εμφανίζεται στην ακόλουθη συλλογή(ές)

Εμφάνιση απλής εγγραφής