HEAL DSpace

Transmission expansion planning in deregulated electricity markets for increased wind power penetration

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Orfanos, GA en
dc.contributor.author Skoteinos, II en
dc.contributor.author Georgilakis, PS en
dc.contributor.author Hatziargyriou, ND en
dc.date.accessioned 2014-03-01T02:47:07Z
dc.date.available 2014-03-01T02:47:07Z
dc.date.issued 2010 en
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/33008
dc.subject Electricity markets en
dc.subject Locational marginal pricing en
dc.subject Power-pool en
dc.subject Transmission congestion en
dc.subject Transmission expansion planning en
dc.subject Transmission security en
dc.subject.other Electricity market en
dc.subject.other Locational marginal pricing en
dc.subject.other Power-pool en
dc.subject.other Transmission congestion en
dc.subject.other Transmission expansion planning en
dc.subject.other Transmission security en
dc.subject.other Commerce en
dc.subject.other Costs en
dc.subject.other Deregulation en
dc.subject.other Economics en
dc.subject.other Electric power generation en
dc.subject.other Expansion en
dc.subject.other Investments en
dc.subject.other Lakes en
dc.subject.other Traffic congestion en
dc.subject.other Uncertainty analysis en
dc.subject.other Wind power en
dc.subject.other Electric generators en
dc.title Transmission expansion planning in deregulated electricity markets for increased wind power penetration en
heal.type conferenceItem en
heal.identifier.primary 10.1109/EEM.2010.5558698 en
heal.identifier.secondary http://dx.doi.org/10.1109/EEM.2010.5558698 en
heal.identifier.secondary 5558698 en
heal.publicationDate 2010 en
heal.abstract In this paper, a model for transmission expansion planning (TEP) in deregulated electricity markets is developed, considering transmission congestion, wind power integration and double-sided bidding power-pool operation for both generation and demand. A compromise between the congestion revenue and the investment cost is used to determine the optimal expansion scheme, considering the outage rates of transmission lines. Both the level of congestion and the price deviation in the network are used as the driving indicators for the need of network expansion. The uncertainty in wind power generation introduces the probabilistic locational marginal prices (LMPs) and the estimated congestion revenue for a specific system configuration. The proposed TEP approach is applied on Garver's six bus system and the planning schemes results are assessed. © 2010 IEEE. en
heal.journalName 2010 7th International Conference on the European Energy Market, EEM 2010 en
dc.identifier.doi 10.1109/EEM.2010.5558698 en


Αρχεία σε αυτό το τεκμήριο

Αρχεία Μέγεθος Μορφότυπο Προβολή

Δεν υπάρχουν αρχεία που σχετίζονται με αυτό το τεκμήριο.

Αυτό το τεκμήριο εμφανίζεται στην ακόλουθη συλλογή(ές)

Εμφάνιση απλής εγγραφής