HEAL DSpace

Urban water modelling and the daily time step: issues for a realistic representation

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Makropoulos, C en
dc.contributor.author Rozos, E en
dc.contributor.author Butler, D en
dc.date.accessioned 2014-03-01T02:54:09Z
dc.date.available 2014-03-01T02:54:09Z
dc.date.issued 2009 en
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/36648
dc.title Urban water modelling and the daily time step: issues for a realistic representation en
heal.type conferenceItem en
heal.publicationDate 2009 en
heal.abstract Interest in modelling the total Urban Water Cycle is increasing, due to the realisation of the need for (high-level) flow integration to address issues of recycling, re-use and ultimately sustainability. Urban Water Cycle models are generally operating on a daily time step due to the inherent strategic/planning nature of such work. However, the choice of time step implies (more or less hidden) assumptions which may influence significantly the model’s performance. One such assumption – the way in which water tanks (e.g. rainwater, greywater, greenwater etc) are operated in terms of the sequence between tank overflow (spill) and water extracted from the tank for use (yield) is investigated in this paper. The two alternative sequences are termed here Yield After Spill (YAS) and Yield Before Spill (YBS). The Urban Water Optioneering Tool was used and advantages and disadvantages of these sequences were examined. The paper reviews the differences under a series of technological configurations and draws recommendations for modelling practice. It is suggested that YAS/YBS schemes have different impacts depending on the technological configuration of the case study under investigation, but that under normal operating conditions, daily time step simulations with YBS schemes tend to result in tank sizes that are (marginally) closer to sizes obtained by hourly time-steps. It is however suggested that YAS schemes should be preferred when the parameter of interest is runoff. en


Αρχεία σε αυτό το τεκμήριο

Αρχεία Μέγεθος Μορφότυπο Προβολή

Δεν υπάρχουν αρχεία που σχετίζονται με αυτό το τεκμήριο.

Αυτό το τεκμήριο εμφανίζεται στην ακόλουθη συλλογή(ές)

Εμφάνιση απλής εγγραφής