HEAL DSpace

A Cold Ironing Feasibility Study and Cost Benefit Analysis: the case of Thessaloniki port

Αποθετήριο DSpace/Manakin

Εμφάνιση απλής εγγραφής

dc.contributor.author Κρητικός, Ορφέας-Μάρκος el
dc.contributor.author Kritikos, Orfeas-Markos en
dc.date.accessioned 2017-09-07T07:31:54Z
dc.date.issued 2017-09-07
dc.identifier.uri https://dspace.lib.ntua.gr/xmlui/handle/123456789/45549
dc.identifier.uri http://dx.doi.org/10.26240/heal.ntua.14362
dc.rights Default License
dc.subject Ηλεκτροδότηση πλοίων el
dc.subject Ξηρά el
dc.subject Λιμάνια el
dc.subject Θεσσαλονίκη el
dc.subject Cold Ironing el
dc.subject On shore Power Supply el
dc.title A Cold Ironing Feasibility Study and Cost Benefit Analysis: the case of Thessaloniki port en
heal.type bachelorThesis
heal.secondaryTitle the case of Thessaloniki port en
heal.classification Feasibility study en
heal.classification Cost benefit analysis en
heal.classificationURI http://zbw.eu/stw/descriptor/10548-2
heal.classificationURI http://skos.um.es/unescothes/C00818
heal.dateAvailable 2020-01-01
heal.language en
heal.access free
heal.recordProvider ntua el
heal.publicationDate 2017-07-11
heal.abstract This diploma thesis, explores the possibility of a Cold Ironing installation in Thessaloniki’s port from a Cost-Benefit perspective. At first a feasibility study is conducted in order to determine the cost of implementing on-shore power supply to the port. An additional investment in a Photovoltaic Park within the port, in the context of moving forward a greener path, as well as for financial profitability, has also been investigated. However, the nature of such an investment is more environmental rather than financial. Therefore, the external benefits for Human health, environment, society and ecosystem have to be examined carefully before reaching a decision. The comparison between actual monetary and beneficial monetary outcomes, is quite a difficult task and the result may vary from a different perspective. Nevertheless, it is more than clear that the environmental benefits for Thessaloniki –a town which has already quite insulted atmosphere- are great. Moreover, in order to connect these advantages with a profitable investment strategy, numerous scenarios and possibilities have been analysed. The problem arises when electricity prices of on-board and on-shore generated sources are compared. Currently on-shore generated power is much more expensive than on-board. Therefore, shipowners are unlikely to use the facilities if there lays a loss. The most important step to make it a vital solution for both port administrators and ship-owners is that of introducing a special tax exception in electricity fee. That way, the cost between on-shore generated and on-board generated could be competitive for ship owners, and it depends on the percentage of reduction the profitability of the port. el
heal.advisorName Λυρίδης, Δημήτριος el
heal.committeeMemberName Βεντίκος, ΝΙΚΟΛΑΟΣ el
heal.committeeMemberName Προυσαλίδης, Ιωάννης el
heal.academicPublisher Εθνικό Μετσόβιο Πολυτεχνείο. Σχολή Ναυπηγών Μηχανολόγων Μηχανικών. Τομέας Μελέτης Πλοίου και Θαλάσσιων Μεταφορών el
heal.academicPublisherID ntua
heal.numberOfPages 120 σ. el
heal.fullTextAvailability true


Αρχεία σε αυτό το τεκμήριο

Αυτό το τεκμήριο εμφανίζεται στην ακόλουθη συλλογή(ές)

Εμφάνιση απλής εγγραφής